Operable Partitions Installation Steps:
1. Preparation:
- Prepare Materials: Steel Structure, Door Panels, Aluminum Track, Rollers, Z Steel Bracket, Screws etc.
- Prepare Installation Tools: Electric drill, welding machine, level machine, screwdriver, tape measure, wrench, etc.
- Measure the Space: Accurately measure the length, width, and height of the installation area
2. Start the Installation:
(1) Positioning and Marking
- Confirm the installation positions of the operable partitions on the floor, ceiling, and walls, ensuring the install position is correct.
- Use a level machine to mark the lines on the floor, walls and ceilings.
(2) Install Steel Structure and Aluminum Track
- Fixing the expansion screws to concrete slabs.
- Install and welding the steel structure according to the project drawing.
- Fixed the aluminum track on the steel structure by Z bracket and rod screws.
- Adjust the aluminum track height and level.
(3) Install the Partition Panels
- Take off the middle short track first so we can insert the panels into aluminum track.
- Insert the partition panels into the tracks, starting from one end and proceeding sequentially.
- Ensure the panels slide smoothly without any jamming.
- Install back the short track and then fixed.
(4) Adjustment and Fixing
- Adjust the panel positions to ensure they are vertical and level.
- Each partition panels have a screw on the roller rod, we need to fixed it after adjust finished.
3. Test the Operation and Cleanup
- Inspection: Test the sliding of the operable wall to ensure smooth operation and confirm there is no looseness or tilting.
- Cleanup: Clean the installation site and remove any excess materials and tools.
4. Precautions
- Safety First: Wear protective gear to avoid injuries.
- Accurate Measurement: Make sure the measurements and markings is correct to avoid installation errors.
- Secure Installation: Ensure the tracks and panels are firmly installed to prevent tipping or sliding issues.
- Soundproofing: If sound insulation is required, add sealing strips between the tracks and panels. And it’s better to install the soundproof barrier on the ceiling, the sound insulation will better.
By following the above steps, the installation of operable partitions can be successfully completed. For larger projects, it is recommended to hire professionals for construction.